CARBOTURA Feedstock Assessment · Oʻahu
DOC 03 OF 06 · Feedstock Assessment · SP-03

Oʻahu, Hawaiʻi — Feedstock Assessment

Oʻahu’s ~880 TPD of available manufacturing feedstock flows to a facility with a binding March 2, 2028 closure order and no contracted alternative destination — creating a procurement-critical condition with a 23-month action window.

City & County of Honolulu Population ~1,000,000 Phase Initial 200 TPD GASB accounting standard Single-Site topology May 2026

§0 — What This Means

Oʻahu · Manufacturing Feedstock System Overview

§1 — Feedstock Profile

§1.1 — ACM Capability Finding

ACM is capable of processing every material stream Oʻahu generates. Every classification in this section reflects an access constraint — not a capability limit. The barrier to any stream is contractual, logistical, or regulatory — never technical. MSW, WTE ash, C&D fluff, biosolids, contaminated recyclables, PFAS-containing streams, electronic waste, tires, ASR, and wastewater-associated solids are all confirmed processable by ACM.

§1.2 — Feedstock Volume Table

StreamAnnual Vol. (TPY)Daily (TPD)Current DispositionOperatorAccessACM Phase
MSW — WGSL-bound residual ~321,000 EST~880 Waimānalo Gulch Sanitary Landfill (closing 2028-03-02) Waste Management of Hawaii IMMEDIATE Phase Initial & Medium
Contaminated recyclables / gray-bin residue ~17,000 VER~47 H-POWER / WGSL (misplaced recyclables) City & County ENV IMMEDIATE Phase Initial
H-POWER ash / bottom ash residue ~165,000 VER~452 WGSL; ash-to-aggregate pilot in progress (Reworld™ / City) Reworld™ Honolulu CONDITIONAL Phase Medium+
C&D fluff & residue ~60,000 EST~164 PVT Land Company C&D Landfill, Waianae PVT Land Company Ltd CONDITIONAL Phase Medium+
Biosolids (dewatered) — WWTPs ~35,000 EST~96 Sand Island WWTP, Honouliuli WRF, Kailua WWTP — partial compost, partial landfill City & County ENV (DPW) CONDITIONAL Phase Medium+
Electronic waste / hazardous materials ~8,000 EST~22 City drop-off locations — partial recycling, partial landfill City & County ENV CONDITIONAL Phase Medium+
General material recycling (diverted MSW) ~412,000 VER~1,128 Multiple recyclers — off-island export, local reuse Multiple ACCESSIBLE Phase Expanded
Green waste / organics (composted) ~47,000 EST~129 Hawaiian Earth Recycling — Menehune Magic compost (contract to 2045) Hawaiian Earth Recycling ACCESSIBLE Phase Expanded
Data Quality Disclosure — Planning Basis

MSW volumes sourced from City & County ENV published Rates and Data (2023 actuals). WGSL-bound residual (~321,000 TPY) derived by subtracting H-POWER intake (544,311 TPY verified), general recycling (~412,000 TPY verified), and organics diversion from total MSW (~1,197,127 TPY verified, 2019; adjusted for 2023 trend). Biosolids and C&D volumes estimated from state permit records and national per-capita benchmarks. H-POWER ash per ENV landfill status reporting. ESTIMATED — Joint Working Group phase confirmation required.

§1.3 — Primary ACM Feedstocks

Two streams carry IMMEDIATE classification — no third-party contract barrier and available for Phase Initial CSA delivery:

Phase Initial at 200 TPD draws entirely from these IMMEDIATE streams. No third-party contract renegotiation is required for Phase Initial deployment.

§1.4 — Full ACM Feedstock Capability Statement

Per the ACM Authoritative Feedstock Capability List (MR §16), Carbotura’s Advanced Circular Manufacturing system is capable of processing all streams present in Oʻahu’s manufacturing feedstock system: mixed MSW, WTE/RRF ash, C&D fluff, biosolids, contaminated recyclables, PFAS-containing streams, electronic waste, tires, ASR, and wastewater-associated solids. Access classifications reflect logistical, contractual, or regulatory staging — never ACM technical limitation.

§2 — Logistics and Infrastructure

Oʻahu’s solid waste collection system serves over 200,000 residential accounts through seven collection yards, three major transfer stations (Keehi, Kapaa, Kawailoa), seven residential convenience centers (including Waipahu), and enclosed delivery vehicle fleets operating island-wide. The island’s geography concentrates feedstock flows toward the west — both H-POWER and WGSL are at Campbell Industrial Park / Kapolei. All three transfer stations aggregate volume and route to these western facilities via H-1, H-2, and H-3 corridors.

Driving distances to Campbell Industrial Park zone from key transfer nodes: Keehi (central Honolulu) ~16 miles via H-1; Kapaa (Windward) ~25 miles via H-3 or Pali Hwy; Kawailoa (North Shore) ~22 miles via H-2. Waipahu Convenience Center is ~4 miles from the Campbell Industrial Park zone. This convergence makes the Campbell Industrial Park zone the natural ACM facility location for Phase Initial — minimal route modification required.

The enclosed delivery vehicle fleet currently servicing H-POWER is fully compatible with ACM intake requirements. Sealed, compacted feedstock loads meet ACM intake specifications without modification. No new collection infrastructure is required for Phase Initial.

§3 — Cost Structure

§3.1 — Current System Cost Table

Cost ElementAnnual ValuePer-TonSource TypeConfidence
H-POWER processing — MSW tipping fee ~$49.5M/yr EST $91/ton VER Honolulu Civil Beat (2020); ENV public record High (rate confirmed; volume estimated)
WGSL landfill operations — MSW tipping ~$9.3M/yr EST ~$103/ton EST Derived: ENV budget + volume data Medium (full system cost proxy)
WGSL — H-POWER ash disposal ~$17.0M/yr EST ~$103/ton EST Volume verified (ENV); rate estimated Medium
Off-island shipping (emergency / overflow) Episodic VER $99/ton Hawaii Business Magazine; ENV testimony High (COVID period; not baseline)
Transfer station operations (3 major stations) ~$8.5M/yr EST N/A Per-station industry benchmark Low — data gap
Green waste composting (Hawaiian Earth Recycling) ~$1.8M/yr VER ~$38/ton Hawaii Business Magazine; public record High
WGSL post-closure care liability (GASB 18) NULL DATA GAP NULL Not publicly disclosed Low — material gap for/Exogenesis™ analysis
Future Makaiwa Hills landfill capital cost NULL DATA GAP NULL EIS and design not commenced Low — major future unquantified obligation
Finding — Full System Cost vs. Gate Rate Gap

The collector-facing H-POWER rate ($91/ton) understates the full Feedstock Weighted Disposal Cost (FWDC). Incorporating WGSL tipping, transfer station overhead, post-closure liability accrual, and the future Makaiwa Hills construction cost (unquantified), the planning-basis FWDC is estimated at approximately $103/ton ESTIMATED. This will be refined during the Joint Working Group phase. The Beneficiation Fee floor ($100/ton) applies regardless: MAX($100, MIN($150, $103−$5)) = MAX($100, $98) = $100/ton. See Proposal §3.

§3.2 — Operator Names (Verified)

Reworld™ Honolulu (formerly Covanta Honolulu Resource Recovery Venture) — operator of the H-POWER Waste-to-Energy facility at 91-174 Hanua St, Kapolei, HI 96707. Reworld™ is the current operating name following the 2023 Covanta rebranding. Operates under a long-term power purchase agreement with Hawaiian Electric (HECO). reworld.com · +1 800-950-8749.

Waste Management of Hawaii — operator of WGSL under contract with the City & County. 92-460 Farrington Hwy, Kapolei, HI 96707. LUC Special Use Permit SP09-4031. wm.com · +1 808-668-2985.

PVT Land Company Ltd — operator of Oʻahu’s only C&D landfill at 87-2020 Farrington Hwy, Waianae, HI 96792. Accepts C&D debris only. +1 808-668-4561.

Hawaiian Earth Recycling — City organics/green waste composting programme under contract to 2045. Produces Menehune Magic compost. Not a solid waste landfill operator.

City & County of Honolulu, Department of Environmental Services (ENV) — system operator for transfer stations, convenience centers, and wastewater treatment plants. honolulu.gov/env.

§3.3 — Cost Trajectory

Mechanism 1 — Rate escalation. The H-POWER tipping fee is subject to contractual escalation linked to CPI and fuel cost adjustments. Historical escalation has averaged 2–3% per year. At 2.5% annual escalation, the $91/ton gate rate reaches approximately $126/ton by 2035 and $161/ton by 2045. The WGSL tipping rate is adjusted periodically by City Council under ROH Chapter 9 — recent adjustments have tracked inflation.

Mechanism 2 — Capital reinvestment pressure and new landfill cost. The Makaiwa Hills landfill expansion requires Act 73 amendment or waiver, EIS preparation, land acquisition (potentially through condemnation), and construction. Island landfill capital benchmarks are $150–$300M. This unquantified obligation will be financed through tip fees, creating upward rate pressure regardless of the Makaiwa Hills timeline. The City’s post-closure care liability for WGSL (GASB 18) is an additional unquantified future obligation that will require rate support.

Mechanism 3 — Absence of competitive alternatives. Oʻahu’s island geography eliminates the mainland competitive dynamics that discipline disposal rates. Off-island shipping ($99/ton, COVID period) is the only backstop alternative — not available at scale. Military lands (Waipio Peninsula, Iroquois Point, Bellows) have been excluded. Makaiwa Hills depends on contested legislation and a multi-year permitting process. This structural disposal monopoly will intensify cost pressure through 2028 and beyond.

§4 — Regulatory Baseline

Hard Deadline — Binding LUC Order

March 2, 2028 — WGSL must cease accepting all forms of waste. This is a binding Decision & Order of the Hawaiʻi Land Use Commission (D&O, November 1, 2019; SUP SP09-4031). The City received one extension to identify an alternative site (extended to December 31, 2024, granted August 23, 2024). No further extension has been granted or is currently pending. To achieve Phase Initial COD before March 2028, ACM engagement authorization (T0) must occur by mid-2026 — approximately 23 months from this engagement date.

Permit status — H-POWER: Reworld™ Honolulu operates under a long-term energy conversion and power purchase agreement at nameplate capacity. No capacity expansion is under review. The ash-to-aggregate pilot (City/Reworld™ contract) is a volumetric reduction pilot, not a capacity expansion. H-POWER cannot absorb displaced WGSL-bound feedstock.

Environmental compliance — WGSL: The facility has an EPA Clean Water Act enforcement history (settlement April 2019; $425K penalty). PFAS has been detected in landfill leachate at Hawaiʻi landfill sites consistent with national regulatory trends. Post-closure PFAS liability at WGSL is an unquantified exposure for the City, growing with each year of continued operation. ACM’s 1,200°C+ elemental dissociation process permanently destroys PFAS — eliminating this liability on diversion.

Act 73 (2020): State law restricting new landfill siting within half-mile buffers of residences, schools, and hospitals, and prohibiting conservation district siting. Makaiwa Hills requires Act 73 amendment or waiver — contested in 2024 and 2025 legislative sessions without resolution.

Policy alignment: Hawaiʻi State targets 70% solid waste diversion from landfill by 2030. ACM deployment at 200 TPD directly contributes to this target. The NAICS manufacturing classification (Sector 31–33) aligns with Hawaiʻi’s economic diversification goals and qualifies for state manufacturing tax abatement under HRS §237.

§5 — Feedstock Opportunity

§5.1 — System-Wide Addressable Volume Summary

CategoryVolume (TPY)TPDAccess
Total MSW generated — Oʻahu~1,197,000 VER~3,279Total system
Immediately accessible~338,000 EST~926IMMEDIATE
Conditionally accessible~268,000 EST~734CONDITIONAL
Accessible with programme build-out~459,000 EST~1,257ACCESSIBLE

§5.2 — Addressability Table

StreamTPYTPDAccessPhaseConstraint
WGSL-bound MSW residual~321,000~880 IMMEDIATEPh. Initial & Medium No exclusive processing contract. WGSL closure eliminates incumbent pathway.
Contaminated recyclables~17,000~47 IMMEDIATEPh. Initial No separate contract. Currently a cost center. ACM accepts without sorting.
H-POWER ash / bottom ash~165,000~452 CONDITIONALPh. Medium+ City/Reworld™ ash-to-aggregate pilot in progress. Redirection requires contract modification at renewal.
C&D fluff and residue~60,000~164 CONDITIONALPh. Medium+ PVT separate permit. Requires PVT coordination at contract stage.
Biosolids (dewatered)~35,000~96 CONDITIONALPh. Medium+ City-operated WWTPs. Direct City & County coordination required.
Electronic waste / hazardous~8,000~22 CONDITIONALPh. Medium+ RCRA permit pathway for listed hazardous streams. Non-listed e-waste: standard intake.
General recycling (diverted)~412,000~1,128 ACCESSIBLEPh. Expanded Multiple recycler contracts and off-island export. Accessible with programme build-out.
Green waste / organics~47,000~129 ACCESSIBLEPh. Expanded Hawaiian Earth Recycling contract to 2045. Accessible post-expiry or as supplemental volumes.

§5.3 — Phase Configuration Preview

Planning Basis — Phase Configuration (Joint Working Group phase confirmation required)

Conservative (IMMEDIATE streams only): Phase Initial 200 TPD (2 modules) = 73,000 TPY · Phase Medium 400 TPD (4 modules) = 146,000 TPY. Both phases fully supportable from WGSL-bound MSW and contaminated recyclables — no third-party contract negotiation required.
Full-system (IMMEDIATE + CONDITIONAL): Phase Expanded 800 TPD (8 modules) = 292,000 TPY. Draws IMMEDIATE streams plus H-POWER ash redirect and C&D fluff. ESTIMATED — subject to Joint Working Group phase confirmation on CONDITIONAL stream access.

§6 — Feedstock Infrastructure Map

Active, closing, and historical feedstock infrastructure on Oʻahu. All facility data sourced from Google Places, City & County ENV public records, Hawaiʻi DOH Office of Solid Waste Management, and EPA enforcement records.

Oʻahu Feedstock Infrastructure
H-POWER / Reworld™ Honolulu
Reworld™ (fmr. Covanta) · 91-174 Hanua St, Kapolei
WTE/RRF · Active · ~2,400 TPD capacity
reworld.com ↗
Waimānalo Gulch Sanitary Landfill (WGSL)
Waste Management of Hawaii · 92-460 Farrington Hwy, Kapolei
MSW Landfill · CLOSING 2028-03-02 (LUC D&O)
honolulu.gov/env ↗
PVT Land Company — C&D Landfill
PVT Land Company Ltd · 87-2020 Farrington Hwy, Waianae
C&D Landfill · Active · C&D debris only
Keehi Transfer Station
City & County ENV · 606 Middle St, Honolulu
Transfer Station · Active · Primary urban aggregation
honolulu.gov/env ↗
Kapaa Transfer Station
City & County ENV · 100 Kapaa Quarry Rd, Kailua
Transfer Station · Active · Windward aggregation
honolulu.gov/env ↗
Kawailoa Transfer Station
City & County ENV · 62-180 Kawailoa Dr, Haleiwa
Transfer Station · Active · North Shore aggregation
honolulu.gov/env ↗
Waipahu Convenience Center
City & County ENV · 94-9 Waipahu Depot St, Waipahu
Transfer / Convenience Center · Active · Central Oʻahu / ʻEwa
Sand Island Wastewater Treatment Plant
City & County ENV · 1350 Sand Island Pkwy, Honolulu
WWTP / Biosolids · Active · Primary urban wastewater
honolulu.gov/env ↗
Honouliuli Water Recycling Facility
City & County ENV · 91-1000 Geiger Rd, ʻEwa Beach
WWTP / Biosolids · Active · West Oʻahu
Kailua Regional Wastewater Treatment Plant
City & County ENV · 95 Kaneohe Bay Dr, Kailua
WWTP / Biosolids · Active · Windward service area
Halawa Landfill (Closed)
City & County (historical) · Pearl City / Aiea area
Closed MSW Landfill · ~1985 · DOH inactive landfill record
Nānākuli Landfill (Closed)
State / County (historical) · Waiʻanae Coast
Closed MSW Landfill · pre-1990 · DOH inactive landfill record
Pin Legend
WTE/RRF Closing Landfill C&D Landfill Transfer WWTP Closed
Sources: Google Places · City & County of Honolulu ENV (honolulu.gov/env) · Hawaiʻi DOH Office of Solid Waste Management · EPA ECHO · Honolulu Star-Advertiser · Verified May 2026.

Appendix A — Evidence Chain

FigureValuePublic SourceTypeConfidence
WGSL closure dateMarch 2, 2028LUC D&O November 1, 2019; ENV landfill statusVERHigh
Oʻahu MSW total (2019)1,197,127 TPYCity & County ENV Rates and DataVERHigh
H-POWER intake (2019)544,311 TPYCity & County ENV Rates and DataVERHigh
H-POWER ash to WGSL~165,000 TPYENV new landfill siting pageVERHigh
H-POWER tipping fee$91/tonHonolulu Civil Beat (2020); ENV public testimonyVERHigh
Off-island shipping cost$99/tonHawaii Business Magazine; ENV testimonyVERHigh (COVID period)
Contaminated recyclables17,158 TPYCity & County ENV recycling data 2023VERHigh
FWDC planning basis~$103/tonDerived from ENV budget + volume recordsESTMedium
WGSL EPA settlement (2019)$425KEPA press release April 29, 2019VERHigh
H-POWER operator rebrandCovanta → Reworld™Reworld corporate; Google MapsVERHigh
Navy land exclusionApril 12, 2024Navy letter to Mayor BlangiardiVERHigh
Makaiwa Hills selectionDecember 2024ENV landfill siting status; Star-AdvertiserVERHigh

Appendix B — Change Factors

FactorDirectionMechanism
WGSL closure date extensionReduces urgencyCity could petition LUC for further extension; contested and uncertain. Does not resolve the structural problem.
Makaiwa Hills fast-track permittingReduces immediate pressureAct 73 amendment + EIS + construction = minimum 4–6 years. Does not resolve the 2028 gap.
H-POWER Reworld™ contract renegotiationOpens CONDITIONAL streams soonerAsh redirection to ACM possible at contract renewal. Timing subject to undisclosed contract terms.
Hawaiʻi 70% diversion target (2030)Increases addressable volumeState mandate creates alignment with ACM manufacturing output. May accelerate permitting support.
PFAS regulatory tighteningIncreases cost of current pathwayEPA PFAS CERCLA designation creates liability exposure for WGSL. ACM 1,200°C+ destruction permanently eliminates PFAS.

Appendix C — Sources and References

Appendix D — Authoritative Glossary

TermDefinition
Advanced Circular Manufacturing (ACM)Carbotura’s proprietary manufacturing system using Microwave Catalytic Reforming (anoxic elemental dissociation) to convert secondary feedstocks into synthetic graphite, graphene compounds, recovered minerals, and other RevCon™-graded products. NAICS Sector 31–33 manufacturing classification. Not incineration — oxygen-free, sub-atmospheric, 1,200°C+.
Manufacturing feedstockAny secondary material stream delivered to an ACM facility under a CSA. Replaces “solid waste,” “MSW,” “garbage,” or “trash” in Carbotura’s operating context.
Total Material Conversion (TMC)The process by which ACM converts manufacturing feedstock into RevCon™-graded manufactured materials. Replaces “waste diversion” or “waste reduction.”
Beneficiation Fee (TMC Fee)Manufacturing Beneficiation Fee paid by the City & County to Carbotura per ton under the CSA. Formula: MAX($100, MIN($150, FWDC−$5)). Oʻahu planning basis: $100/ton (floor). See Proposal §3.
Circular Royalty™Royalty paid by Carbotura to the City & County under the CSA. 120% of that year's Beneficiation Fee, +1 pp/yr on multiplier, 13-month lag, rolling monthly. Year 2: $120/ton. Independent transaction.
Royalty paid by Carbotura to the City & County under the CSA. Applies a 120%→150% multiplier to the current-year escalated Beneficiation Fee, 13-month lag, rolling monthly.
Exogenesis™ RoyaltyUniversal bonus royalty. $50/ton of WGSL mass extracted by Exogenesis™, +1%/yr compound, 13-month lag. Available under the CSA. Activation subject to Waste Characterization Study, qualifying asset confirmation, and mutual agreement at CSA execution.
FWDC (Feedstock Weighted Disposal Cost)Blended per-ton cost of the current feedstock disposition system. Oʻahu planning basis: ~$103/ton ESTIMATED.
Access ClassificationIMMEDIATE: no contractual or logistical barrier. CONDITIONAL: accessible following contract renegotiation or permit pathway. ACCESSIBLE: accessible with programme build-out. Never “not addressable” — ACM capability is unlimited.
GASB 18GASB Statement No. 18 — Municipal Solid Waste Landfill Closure and Postclosure Care Costs. WGSL closure on March 2, 2028 triggers full recognition of this liability. Exogenesis™ Royalty election extinguishes this liability at CSA execution.
Separate Transaction PrincipleMR §4.8 rule: Beneficiation Fee and each Royalty stream are independent payment obligations — never netted, offset, combined, or co-mingled in any presentation.
Circular Supply Agreement (CSA)Primary commercial agreement between the City & County of Honolulu and Carbotura. Minimum 30-year term from Phase Initial COD. Perpetual continuation unless terminated by Non-Renewal Notice (Year 28+; 24-month notice; Year 30 earliest exit).
State ACurrent system: feedstock to H-POWER and WGSL, with WGSL closing March 2, 2028 and no contracted alternative.
State BACM deployment: feedstock to Carbotura ACM facility; royalty payments to City & County; WGSL post-closure obligations extinguished (if Exogenesis™ Royalty elected).
Was this assessment useful?
Feedstock System Assessment · 16 min read · DOC 01 OF 06

What this document is

How the City and County of Honolulu’s residual stream is generated, routed and paid for today — volumes, current commitments, cost basis, and the share that qualifies as manufacturing feedstock.

Three things this document says
  1. The City and County of Honolulu faces a binding closure date for its principal disposal site.
  2. The collector-facing rate understates what the system actually costs; the Fully-Weighted Disposal Cost is the correct basis for any comparison.
  3. The addressable stream is large enough to support deployment without competing with the City and County of Honolulu’s own diversion goals.